Bright House Networks Stadium - Fact & Figures

Facts & Figures

  • • Architect: 360 (Kansas City, Mo.)
    • Construction Manager: Wharton-Smith, Inc. (Sanford, Fla.)
    • Stadium Seating Contractor: Dant Clayton (Louisville, Ky.)
    • Seating Capacity: 45,301
    • 822 Club Seats.
    • 24 Luxury Suites.
    • ADA Seating: Capable of providing over 450 wheelchair-accessible seats.
    • Cost: ~$55 Million
    • Scoreboards: There are two stadium scoreboards. The scoreboard mounted on the south end of the stadium measures 50' x 8'. The north scoreboard measures 100' x 37' and features a 34' x 22' Daktronics ProStar VideoPlus screen capable of displaying live video and instant replays, as well as game information, player and team statistics, advertising, graphics and animation in 16.7 million colors. In addition, the north scoreboard contains a 5'7 x 72' 23mm ProAd digital display.
    • Stadium Gates: There are 18 stadium gates, including two service entrances.
    • Playing Field: The natural turf is Tifway 419 hybrid Bermuda.
    • There are 10 ticket windows; four on the east side, four on the west side, and two will-call windows on the south side.
    • Restrooms: 10 women's, 7 men's and 4 family/special needs. Fixtures include 427 toilets, 104 urinals and 296 sinks. All restrooms are handicapped accessible.
    • Concession Stands: There are 11 permanent concession stands. Additional product kiosks are located throughout the stadium on the main concourse.
    • Locker Rooms: The Knights locker room, located on the south end of the field, is over 10,000 square feet in size and includes separate rooms for coaches, sports medicine, and equipment storage/distribution. A locker room over 8,000 square feet in size is provided on the north end of the field for the visiting team. Individual dressing rooms are also provided in the stadium for the game officials, chain crew, and cheerleaders.
    • The Roth Tower contains a Club Lounge (4,200 square feet) with seating for 822.
    • Video monitors: There are 63 video monitors mounted throughout the stadium. Most of the displays are Panasonic 42 1080p high definition plasma screens.
    • The stadium lighting system is the Sportscluster Green Lighting System by Musco. There are 168 1,500 watt metal halide fixtures mounted on four 140' galvanized steel poles.
    • Footprint: 25 acre site.
    • Facility Area: 1,089,000 square feet.
    • The stadium is a steel structure, containing 2,452 tons of steel. More than 600 truckloads of concrete were used (equivalent to 60,000 yards or 1,620,000 cubic feet) with a weight of approximately 240,000,000 pounds.
    • Stadium Dimensions: 725 feet wide x 900 feet long.
    • Roth Tower: 200 feet long x 50 feet wide x 120 feet high. There are 190 steps from ground level to the roof.
    • Ornamental Fencing and Gates: approximately 1,195 linear feet of ornamental fencing and gates surround the stadium.
    • Electrical Wiring: There are approximately 30 miles of underground electrical wiring.
    • Conduit: There are approximately 24 miles of underground conduit.


  •  
  • NCAA
  • American
  • UCF.edu